Plant & Concrete Certification
NCBVA certification is currently renewable every 5 years.
The schedule for certification is based on certification date and geographic location. All certifications will be conducted by a Concrete Specialist. Certification certificates are mailed twice a year.
Areas observed during a certification visit include maintenance and cleanliness, production, employee safety, and concrete load testing (performed by third-party testing facility).
In order to be added to the certification schedule, plant must be an active member of the NCBVA (up to date with dues).
Cost of Certification
Plant certifications are $3000 per site*. For non-Doric plants, fees to be paid by site (not dealer). For Doric plants, fees are direct billed to Doric. With the exception of the $125 cylinder, prices for a plant revisit for additional concrete cylinder testing starts at $450 based on location, travel expenses, and availability of an inspector in the area.
*$3000 plus cylinder testing.
― Concrete Specialist ―
M E E T O U R
Patrick Lewandowski
Patrick has 31 years of industry experience and education in civil engineering construction materials, working directly in the cement, ready-mix, governmental specification, mining, tunneling, precast, and macro-synthetic fiber industries.
Sample Certification Process
| 8:00 | | | Introduction to the Concrete Specialist & the NCBVA Certification Program |
| 8:30 | | | Begin Review of Operations |
| 9:30 | | | Perform Center Load Testing |
| 10:30 | | | Test & inspect vault molds and all materials used for the concrete operations (including admixtures & mix design) |
| 11:00 | | | Prepare compressive strength cylinders for testing |
| 12:00 | | | Review findings. Make recommendations. Address any concerns. |
| 12:30 | | | Depart. |
― Production Observations ―
Concrete Mix Design
Mixing Water
Water/Cement Ration
Concrete Reinforcing
Aggregates (Storage & Handling
Admixtures
Air Entrainment
Accelerators/Retarders
Batching/Mixing
Materials Proportioning
Mixer
Placing of Concrete
Consolidation of Concrete
Severe Ambient Conditions
Concrete Finishing
Patching
Curing
Flexural Strength
Compressive Strength
Slump/Spread
Air Content
Organic Impurities
Certification Cancellation Policy
2+ WEEKS FROM VISIT
No penalty
2 WEEKS PRIOR
$350 Penalty
DAY BEFORE VISIT
$500 Penalty
DAY OF VISIT
$600 Penalty + Rescheduling Fee